If you’re planning a construction project in Baltimore County, understanding erosion control rules is critical to avoid delays, fines, or other issues. Here’s what you need to know:
- Permits are required for projects disturbing over 5,000 square feet of land or moving more than 100 cubic yards of soil.
- Sensitive areas like wetlands, floodplains, and land near streams or tidal waters have stricter requirements, even for smaller projects.
- Grading permits must be obtained through the county’s online portal, with proper documentation like grading plans and stormwater management plans.
- Erosion control measures such as silt fences, sediment basins, and stabilized entrances are mandatory before construction begins.
- Regular inspections are required every two weeks, and violations can lead to stop-work orders or permit revocation.
To simplify compliance, consider hiring professionals familiar with local regulations to manage permits, inspections, and erosion control measures.
When You Need to Follow Erosion Control Rules
Understanding when Baltimore County’s erosion control rules apply is crucial to avoid delays and potential fines. The county has specific thresholds and designated areas that determine when permits are required. Here’s a breakdown to help you navigate these regulations from the start of your project to its completion.
Land Disturbance Size Limits
If your project disturbs more than 5,000 square feet or involves moving over 100 cubic yards of soil, you’ll need a permit. However, even smaller projects may require permits depending on their location. Unless specifically exempted, the county mandates permits for all land disturbance activities [3].
Special Areas with Extra Requirements
In some cases, location alone can trigger the need for a permit. Here are a few examples:
- Environmentally Sensitive Areas: Any grading in watercourses, floodplains, wetlands, buffers, or designated habitat areas requires a permit. These areas are protected to maintain ecological balance and reduce erosion risks.
- Chesapeake Bay Critical Area: This includes all land within 1,000 feet of tidal waters and tidal wetlands. Projects in this zone face stricter scrutiny to protect water quality. The county provides a Chesapeake Bay Critical Area Map as a geodatabase to help identify these zones [2].
- Highly Erodible Soils: Projects on soils prone to runoff and erosion – often determined by steep slopes or specific soil evaluations – are subject to additional oversight. These conditions demand stronger erosion control measures [2].
- Stream Proximity: Any work near streams or other sensitive areas may need review by the Baltimore County Soil Conservation District. This ensures measures are in place to safeguard water quality and local ecosystems [4].
Projects That Don’t Need Permits
Smaller projects that disturb less than 5,000 square feet of surface area and move under 100 cubic yards of soil generally don’t require grading permits – unless they’re in sensitive areas. For example, residential projects below these thresholds might be exempt, provided they’re not located in protected zones.
That said, it’s essential to measure your planned disturbance area and estimate soil movement accurately. Even if your project seems exempt based on size, its location could still require compliance with erosion control rules. For instance, projects near streams or within protected zones almost always need permits, regardless of their size.
In short, while project size is important, location often carries more weight. A small project in a sensitive area may still require full compliance with the county’s erosion control regulations.
Getting Required Permits and Approvals
If your project requires a permit, Baltimore County’s online portal is your go-to resource for submitting the application. Here’s what you need to know about applying for a grading permit.
How to Apply for a Grading Permit
All permit applications must be submitted through Baltimore County’s online portal. If you don’t already have an account, you’ll need to create one. Then, choose the appropriate application based on whether your project is residential or commercial [3][5].
Your application must include essential details such as the applicant’s information, property owner’s details, and contractor information. Additionally, you’ll need to provide a clear description of the work and its location. Depending on the complexity of your project, the required documentation might include [3]:
- Grading plans that outline existing and proposed site conditions
- Standard plans (if your project qualifies for simplified requirements)
- Grading plans review checklist, completed and signed
- Stormwater management plan, if applicable
- Landscaping and lighting plan, when required
- Any area-specific regulatory documents
When uploading your documents, be sure to follow Baltimore County’s file naming conventions to avoid delays in processing. Smaller projects may qualify for Standard Plans instead of custom-engineered designs. These simplified plans are an option for single-family homes disturbing less than 30,000 square feet or commercial sites with disturbances under 20,000 square feet [1][3]. Using Standard Plans can save both time and money.
Plan Review and Approval Process
Once you’ve submitted your application, the Permit Processing Staff will review your documentation. After confirming everything is complete, they’ll send you a fee calculation that must be paid before the technical review begins.
During the technical review, multiple county departments assess your plans. For larger projects, the Baltimore County Soil Conservation District reviews and approves erosion and sediment control plans. Complex projects often require professional engineers to design plans that meet Maryland Department of Environment standards [1].
Using county-approved third-party inspectors can speed up the permit process [1]. Before construction starts, you’ll need to schedule a pre-construction meeting with department inspectors, your sediment and erosion control representative, and your engineer (if stormwater management is required) [1]. Coordinating all participants ahead of time ensures a smooth process. Following these steps helps you avoid non-compliance and keeps your project on track for approval.
Once approved, it’s important to manage your permit’s validity to prevent any interruptions to your project.
Permit Duration and Renewals
Grading permits are valid for two years [3], while most other permits last one year and can be renewed upon request [5].
Keep in mind, the county may withhold permit approval if sediment control measures are not installed before construction begins [1]. To avoid delays, make sure these measures are installed and inspected ahead of time. Staying on top of inspections and renewing your permit before it expires will help you maintain compliance and keep your project moving forward.
Setting Up Erosion and Sediment Control Measures
Once your permit is approved, it’s time to act quickly on erosion and sediment control measures to ensure you stay compliant.
Before Construction Starts
Organize a pre-construction meeting that includes department inspectors, your sediment and erosion control representative, and, if necessary, your engineer. Construction can only begin after this meeting confirms your measures align with the approved plans and addresses any concerns.
Standard vs. Engineered Control Plans
For smaller projects, you might be able to use a standard control plan based on pre-approved templates. However, larger or more complex sites – especially those near watercourses, floodplains, or wetlands – will need engineered plans. These plans must meet Maryland Department of Environment standards and receive approval from the Baltimore County Soil Conservation District.
Common Control Methods
Baltimore County requires measures designed to filter water runoff and prevent sediment from leaving your site. Some commonly used methods include:
- Silt fences: Installed downhill of disturbed areas to capture sediment, following local guidelines.
- Stabilized construction entrances: Dedicated areas for vehicles to shed dirt, which need regular maintenance.
- Sediment basins: Temporary basins that collect runoff and allow sediment to settle before water is discharged.
- Inlet protection: Gravel bags or filter fabric placed around storm drain inlets to block sediment.
- Temporary seeding or mulching: Applied to exposed soil to provide immediate stabilization.
Baltimore County will inspect your site to ensure compliance with the approved sediment and erosion control plans. Additionally, third-party inspectors approved by the county may monitor and enforce these measures. If you need to make any changes to your approved plans, you’ll first need to get approval from both Baltimore County and the Soil Conservation District.
Inspections, Enforcement, and Staying Compliant
Regular inspections and quick action are key to keeping projects on track and avoiding violations. Here’s what you need to know about inspection schedules, enforcement measures, and responsibilities to ensure compliance.
Required Inspection Schedule
County-approved inspectors conduct compliance checks every two weeks and must submit their findings within 24 hours[1]. These inspections follow the Maryland Standards and Specifications for Soil Erosion and Sediment Control that were in place when your permit application was filed[1].
In addition to these inspections, contractors are required to perform their own periodic checks. This includes inspecting erosion controls after major storms and making any necessary repairs or adjustments to maintain compliance[6][7].
Penalties for Breaking the Rules
Baltimore County takes enforcement seriously. Minor violations usually result in correction notices, but more severe issues can lead to stop work orders, citations, or even permit revocation[1]. The county may also delay permit approvals if sediment control measures are improperly installed. Similarly, grading securities won’t be released unless stormwater management facilities are completed and approved[1]. To avoid these penalties, address correction notices promptly and ensure all erosion controls are functioning as required.
Who Is Responsible for What
Responsibility for erosion control falls on property owners and permit holders, who must install and maintain all required measures[1]. For individual residential lots, this responsibility extends for one year after occupancy approval unless modifications to the property cause a violation[1].
Contractors play a critical role in ensuring that sediment control measures are properly installed and maintained as outlined in the approved plan. Both property owners and contractors must work closely with county inspectors to review and monitor these measures[1]. Hiring county-approved third-party inspectors can also help catch and address potential issues early on[1].
The Baltimore County Soil Conservation District oversees the review and approval of erosion and sediment control plans[1], while county inspectors handle enforcement. Knowing the responsibilities of each agency can make communication smoother and help resolve any problems that might arise. This shared accountability ensures projects stay compliant from start to finish.
sbb-itb-843f8be
How Professional Services Can Simplify Compliance
Dealing with Baltimore County’s erosion control regulations can feel like a daunting task. That’s where working with seasoned professionals can make all the difference. Their expertise not only helps you navigate the rules but also saves you time, money, and unnecessary frustration. In fact, professional support is critical for ensuring smooth and effective compliance with these requirements.
At Pro Landscapes MD, their in-depth local knowledge ensures your project aligns with Baltimore County’s standards at every stage – from initial planning to final approval.
Specialized Services for Grading and Drainage
Expert contractors provide tailored grading and land preparation services. Pro Landscapes MD specializes in land and yard leveling, ensuring proper water flow and sediment control that adhere to county guidelines. They also deliver comprehensive drainage solutions, including French drains, stormwater management, and drain pipe installations. These measures not only meet county standards but also protect your property from potential water damage.
Eco-Friendly Solutions
Pro Landscapes MD also emphasizes sustainable practices. Their use of environmental pavers and other eco-conscious materials ensures compliance with strict regulations while minimizing maintenance in the long run.
Streamlined Permits and Inspections
One of the biggest advantages of hiring professionals is their ability to simplify the permit and inspection process. By preparing accurate and compliant documentation from the start, they help avoid delays. Additionally, their established relationships with county-approved inspectors can expedite issue resolution, keeping your project on track.
Comprehensive Project Management
From the initial landscape design to the installation of retaining walls, drainage systems, patios, and walkways, Pro Landscapes MD handles every detail. They ensure that all elements not only meet erosion control standards but also complement your aesthetic vision. This seamless approach to project management takes the burden off your shoulders.
Conclusion
If your project disturbs 5,000 square feet or more, it’s essential to meet specific permit requirements. This includes submitting erosion control plans to the Baltimore County Soil Conservation District, obtaining grading permits, and attending a pre-construction meeting with county inspectors.
Before breaking ground, make sure to install the necessary control measures like silt fences, sediment traps, and stabilized construction entrances. For sediment controls, stabilize disturbed areas within 3 days, and for all other areas, do so within 7 days [8].
Erosion control doesn’t stop once the project is complete. For one year after occupancy, you’ll need to regularly inspect, maintain, and repair these measures to avoid penalties [1]. Staying proactive with these tasks will help keep your project on track.
If managing these steps feels overwhelming, Pro Landscapes MD can assist. They specialize in navigating local regulations, handling permits, and ensuring your grading and drainage solutions meet compliance standards. Reach out to make the process smoother and more manageable.
FAQs
What erosion control steps are required before starting a construction project in Baltimore County?
Erosion Control Measures in Baltimore County
Before breaking ground on any construction project in Baltimore County, it’s crucial to put erosion control measures in place to meet local regulations. These steps typically involve setting up sediment fences, stabilizing exposed soil, applying mulch, and using sediment traps to prevent soil runoff and erosion.
These measures must be established before any ground disturbance begins. Not only do they help protect the environment, but they also ensure you avoid costly fines. Be sure to carefully review Baltimore County’s specific guidelines to stay fully compliant with their erosion control standards.
How can I find out if my project is in a sensitive area that requires stricter erosion control measures?
If you’re wondering whether your project falls within a sensitive area requiring stricter erosion control measures, the first step is to check Baltimore County’s regulations and maps. These resources highlight areas like streams, steep slopes, and protected habitats that demand extra care.
In some cases, a site evaluation might be necessary – particularly if your project is near water bodies or other protected zones. Projects in these areas often need additional permits and more detailed erosion control plans to reduce environmental impact. To stay on track and avoid potential delays, it’s a good idea to consult local experts or professionals familiar with Baltimore County’s requirements.
What should I do if I receive a correction notice or stop-work order for erosion control violations in Baltimore County?
If you’re issued a correction notice or a stop-work order for not following Baltimore County’s erosion control rules, the first step is clear: halt all work immediately, except for tasks directly related to fixing the cited problems. You’ll need to address the violations within the timeframe outlined in the notice and secure approval from the county before restarting your project.
Ignoring these requirements can lead to fines, penalties, or even further enforcement actions. To steer clear of additional trouble, make sure all corrective actions fully align with the county’s erosion control standards and are completed without delay.